search
The turbine manufacturer’s logo is removed and replaced with visaVento’s. A turbine hub was the first of the turbine parts to be delevered on site. The rest of the parts are expected to arrive once the concrete foundations are finished and have set. We are currently waiting for cooler temperatures, as it is too hot for the concrete work.